Debt Service Fee $0.50 per meter per month
Residential Water Rates
|
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
First 2,500 gallons |
14.47 |
14.76 |
15.05 |
15.35 |
15.66 |
15.97 |
16.29 |
Next 2,500 gallons/per 1000 |
5.52 |
5.63 |
5.74 |
5.85 |
5.97 |
6.09 |
6.21 |
Over 5,000 gallons/per 1000 |
5.80 |
5.92 |
6.04 |
6.16 |
6.28 |
6.41 |
6.54 |
Commercial Water Rates
|
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
First 20,000 gallons |
100.00 |
102.00 |
104.04 |
106.12 |
108.24 |
110.40 |
112.61 |
Over 20,000 gallons/1000 |
5.52 |
5.63 |
5.74 |
5.85 |
5.97 |
6.09 |
6.21 |
Irrigation Rates Residential and Commercial
|
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
First 2,500 gallons |
14.50 |
14.79 |
15.09 |
15.39 |
15.70 |
16.01 |
16.33 |
Over 2,500 gallons/1000 |
5.80 |
5.92 |
6.04 |
6.16 |
6.28 |
6.41 |
6.54 |
Residential Sewer Rates
|
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
Flat Fee |
45.47 |
46.38 |
47.31 |
48.26 |
49.16 |
50.14 |
51.14 |
|
|
|
|
|
|
|
|
Commercial Sewer Rates
|
2015 |
2016 |
2017 |
2018 |
2019 |
2020 |
2021 |
0 -15,000 gallons |
86.88 |
88.62 |
90.39 |
92.20 |
94.04 |
95.92 |
97.84 |
15,001 -50,000 |
289.60 |
295.39 |
301.30 |
307.31 |
313.46 |
319.73 |
326.12 |
50.001 -100.000 |
579.60 |
591.19 |
603.01 |
615.61 |
627.92 |
640.48 |
653.29 |
100,001 - Over |
|
|
|
|
|
TBD |
TBD |
|
New Service Installation Residential
New Account Fee For All New Accounts........................................................
$ 50.00
3/4" meter with impact fees paid .................................................................
640.00
3/4" meter with no impact fees paid ............................................................
895.00
1" meter..................................................................................................1149.00
2" meter.. .............................................................................................
5,118.00
Meter Deposit Residential
3/4" meter.............................................................................................
$ 100.00
1" meter....................................................................................................100.00
2" meter...................................................................................................
500.00
The Board of Directors of the Harvest-Monrovia Water, Sewer and Fire Protection
Authority approved for Impact Fees to be paid on all residential irrigation
water meters. This action was taken at the April 13, 2010 Board Meeting. The
Impact fee will be same as Impact fees on residential lots for development.
Currently this fee is $959.00 and will increase annually same as all other
fees.
This charge will be effective May 1, 2010. Meter cost and deposit will
be determined by size of meter requested.
Miscellaneous Charges
Service charge added if not paid by 4:30 p.m. the day BEFORE cut
off.......... $ 40.00
Turn on fee due to non-payment after hours ................................................
75.00
Returned check fee .....................................................................................
35.00
Broken or cut locks ....................................................................................100.00
Lowering or raising meter for landscaping.....................................................
150.00
Re-read meter if previous reading correct ......................................................
15.00
Replace broken curb-stop ...........................................................................
150.00
Replace broken backflow .............................................................................
150.00
Re-set meter for non-payment ....................................................................
150.00
Replace stolen or frozen meter ....................................................................
200.00
Relocating meter ........................................................................................
500.00
Digging up service for non-payment .............................................................
500.00
Unauthorized use of water (Fine) ..................................................................
500.00
Tampering with any part of water system (Fine) .............................................
500.00
Meter box & lid (picked up)WATER AND SEWER.............................................
75.00
(installed by company)WATER AND SEWER...................................................150.00
Meter box lid only WATER AND SEWER.........................................................
30.00
Round lids for septic tanks at house (installed) SEWER....................................
75.00
Fire Hydrant Installation .............................................................................
3250.00
Debt Service Fee $0.50 Per Month
A $1,599.00 per unit impact fee for each unit at any commercial development.
A unit is described as being no more than 300 gallons of water per
day or a physical building divided for leasing or per one (1) acre.
Fees and units will be determined by the General Manager of the Authority.
Apartments and Townhouses will pay $959.00 per unit impact fees same
as residential lots. Meter fees will be the same as residential meter
fees.
The per unit impact fees shall be paid in advance at the time of preliminary
plan approval.
Any complex using a 6" or larger meter shall pay an additional
$6,285.00 large meter impact fee. If the meter is used for apartments
or multi-unit facilities there shall be an additional $256.00 per unit
meter fee before water is made available. Each unit is defined above.
All fees and units will be determined by the General Manager of the
Authority.
Water meter installation charges for commercial development will be as follows:
New Account Fee for all new accounts............................$50.00
3/4" meter..................................................................$
895.00 plus $100.00 deposit
1" meter .......................................................................1149.00
plus 100.00 deposit
2" meter .....................................................................
5,118.00 plus 500.00 deposit
6" meter ............................................................................
cost plus 500.00 deposit
8" meter ............................................................................
cost plus 500.00 deposit
All meters will be paid in full before actual installments.
Annually, October 1,
there will be at least two percent (2%) increase on all water and sewer
impact fees, tap fees, inspection fees, connection fees, trunk line
charges and all other fees that may be implemented in the future including
both residential and commercial charges. Increase could be more if
deemed necessary by Board.
Annually, January 1, there will be at least two percent
(2%) increase for water and sewer monthly service charge rates, including
both residential and commercial. Increase could be more if
deemed necessary by Board.
There is a $384.00 per lot connection fee for
sand filter sewer system. This will be paid when application is made
for water service to a lot.
An inspection fee of $121.00 will be due at the time of application
for water.
This fee will cover 4 inspections for tank installation on sand filter
systems.
After the 4th inspection visit a charge of $121.00 per visit
will be due and payable before additional inspections will be made.
There is a $3198.00 per lot connection fee for conventional sewer service.
This will be paid when application is made for water service to a lot.
Installation of Fire Hydrant at customer request or installation of
fire hydrant for commercial building. Cost of this installation is
$3250.00.
|